Adding a Project Grid

<< Click to Display Table of Contents >>

Navigation:  Chapter 4 Projects > Project Management > Editing a Project >

Adding a Project Grid

Previous pageReturn to chapter overviewNext page

clip40935

 

A project grid can be added and displayed on Local projects by clicking on the Project Grid button on the toolbar. The Project Grid form below will be displayed.

 

clip40936

 

If the Show grid is checked the following can be specified on this form:

 

Horizontal Grid Spacing: This is used to specify the horizontal distance between grid lines in local coordinates.

 

Starting Value: This is used to specify the starting horizontal value for grid lines in local coordinates.

 

Vertical Grid Spacing: This is used to specify the vertical distance between grid lines in local coordinates.

 

Starting Value: This is used to specify the starting vertical value for grid lines in local coordinates.

 

Line Style: This is the line style for the grid lines. Either solid, dashed, or dotted.

 

Line Color: This is the color of the grid lines. The color can be changed by clicking on the Line Color button.